About ASCE Houston
Welcome to the ASCE Houston Website. Established in 1943, the Houston Branch is one of the largest ASCE Branches in the United States serving more than 3,500 members across 13 local counties. Read our President's Message.
Meeting/Event Information
EWRI Tunnel Vision Webinar Series: 2 of 4 - DC Water and Northeast Ohio Regional Sewer District

EWRI Houston Chapter Tunnel Vision Webinar
As the Houston region assesses whether deep tunnels can complement existing flood control infrastructure, EWRI Houston brings you insights and lessons learned from the owners and operators of the largest deep tunnel systems in the US.
Join us for session two of four in our tunnel webinar series featuring flagship tunnel programs across the country. The September 21 series showcases the DC Water Clean Rivers Project and the Northeast Ohio Regional Sewer District Combined Sewer Overflow (CSO) deep tunnel system. Check out our EWRI page for the other events in the Tunnel Vision series: https://ascehouston.org/EWRI.
Agency Partners:
The Northeast Ohio Regional Sewer District leads effective wastewater and stormwater management. The Sewer District’s CSO Project Clean Lake program will reduce annual Lake Erie pollution by 4 billion gallons by 2032, while its Regional Stormwater Management Program addresses widespread inter-community problems like flooding, pollution, and erosion. The Project Clean Lake program includes seven deep tunnels between 18 ft to 25 ft in diameter at 9,000 ft to 22,000 ft long with three large pump stations. As the largest wastewater treatment provider in the State of Ohio, the Sewer District spans 380 square miles, serves 63 communities and one million residents, and treats 90 billion gallons of wastewater a year.
Did you know that DC Water’s ongoing Clean Rivers Project includes construction of 18 miles of deep tunnels, over 100 feet below ground, and up to 23 feet in diameter? Did you know the first 7-mile segment of the Anacostia River Tunnel system has captured over 15 billion gallons of combined sewage and captured over 9,600 tons of trash, debris, and other solids since being put in service in 2018? Once the final connection is made with the First Street Tunnel and Northeast Boundary Tunnel segments this Summer 2023, the completed 13-mile long Anacostia River Tunnel System will reduce combined sewer overflows to Anacostia River by 98 percent.
Featured Speakers:
Doug Lopata, NEORSD CSO Program Manager
Doug Lopata is the CSO/Collections System Program Manager for the Northeast Ohio Regional Sewer District. He has over 21 years of experience in wastewater and CSO projects, mostly with the NEORSD with responsibility to assist in implementing the agency’s $3 billion CSO Consent Decree program named Project Clean Lake. Efforts include assisting with advanced planning, design, and construction efforts of the CSO program including the Green Infrastructure portion. Heavily involved in finding Value Engineering savings, property acquisition, community interface, and assisting with inter-project coordination. Also responsible for collection system rehab, Hydraulic model update coordination, and with redevelopment impacts on the sewer system. He is a Registered Professional Engineer in Ohio since 2006.
AJ Smith, NEORSD Collections Construction Manager
Aaron (A.J.) Smith is the Collections Group Construction Manager for the Northeast Ohio Regional Sewer District. He has over 23 years-experience with heavy civil and underground construction projects for multiple municipalities/agencies. Starting his career as a union concrete laborer in Pittsburgh, PA, he has since assumed numerous roles in engineering and construction throughout the Midwest U.S. including site inspector, design engineer, contractor superintendent, site safety officer, owner’s representative, and construction manager. He is a Registered Professional Engineer (Ohio, Pennsylvania) as well as a Certified Construction Manager per the Construction Management Association of America.
Dr. Moussa Wone, Director of the Clean Rivers Project, DC Water
Dr. Moussa Wone is the Vice President for the Clean Rivers Project, which is designed to improve water quality by controlling combined sewer overflows to our waterways. The project includes the planning, design, and construction of more than 18 miles of large tunnels along the Anacostia and Potomac Rivers, green infrastructure, targeted sewer separation, and a storage facility along Rock Creek. The CSO discharges captured by Clean Rivers infrastructure will be conveyed to the Blue Plains Advanced Wastewater Treatment Facility for treatment and discharge into the Potomac River.
Rafael Castro, Principal of JCK Underground
Mr. Rafael Castro, P.E. has comprehensive experience from planning to design and construction of tunnels for water, wastewater and transit programs. His expertise includes delivering complex underground projects using both conventional and alternative delivery methods. He has an extensive background in geotechnical engineering, tunnel and deep excavation induced ground and structure movements, and ground improvement associated with tunneling and shaft construction in urban environments.
Sponsored by:

Check out our EWRI page for the other events in the Tunnel Vision series: https://ascehouston.org/EWRI.
Tickets
$10.00 Member Ticket
$15.00 Non-Member Ticket
$0.00 Government or State Agency